Building regulations approved documents A to T: what each part covers

The approved documents are the government guidance on how to meet each part of the building regulations in England. There is one for each part, from Part A for structure to Part T for toilets, plus one for Regulation 7 on materials and workmanship. This page lists them all and links to our guide on each part that comes up in house work.

Building control approved documents: what an approved document is

The Building Regulations 2010 set requirements in Schedule 1, grouped into lettered parts. Each approved document explains one part and gives ways to meet it. Following the approved document is the usual way to show building control the work complies, but it is not compulsory: an engineer or designer can show compliance another way. GOV.UK publishes every approved document free, together with a merged version of them all.

The approved documents, part by part

There is no Part I or Part N: Part N on glazing was merged into Part K in 2013.

Closer rear view of the dormer, KRAMAN Ltd, LondonExposed timber ceiling joists and brickwork during the Brockley house renovation, KRAMAN Ltd, LondonRear garden after landscaping: lawn, curved paving, a low dividing wall and a timber shed, KRAMAN Ltd, LondonTimber vanity unit with two countertop basins during fitting, KRAMAN Ltd, London

Regulation 7 and Regulation 38

Some rules sit in the body of the regulations, outside Schedule 1. Regulation 7 requires building work to be carried out with adequate and proper materials, appropriate to the circumstances, in a workmanlike manner; its approved document explains what that means for products and workmanship. Regulation 7(2) bans combustible materials in the external walls of certain residential buildings over 18 metres. Regulation 38 requires fire safety information to be handed to the responsible person when a building covered by the Fire Safety Order is finished.

Which parts apply to your project

A typical London loft conversion touches Parts A, B, C, F, K, L and P, and Part G and H if it has an ensuite. A rear extension touches A, B, C, F, H, K, L and P. A house converted into flats adds Part E and more of Part B. Building control looks at all of them together; our guide to building control explains how the checks work.

Questions people ask

How many approved documents are there?

One for each part of Schedule 1, Part A to Part T without I and N, plus one for Regulation 7 on materials and workmanship.

Are approved documents law?

No. The law is the Building Regulations 2010; the approved documents are guidance on meeting it, and following them is the usual way to show compliance.

Where can I download the approved documents?

Free from GOV.UK, one by one or as a single merged document.

What is Regulation 7 of the building regulations?

The requirement that building work uses adequate and proper materials and is carried out in a workmanlike manner; Regulation 7(2) also bans combustible materials in the external walls of certain tall residential buildings.