Illustration of a rear extension over a drain run, with inspection chambers, a rainwater pipe and a soakaway in the garden

Approved Document H: Part H drainage, sewers and soakaways for extensions

Approved Document H is the guidance on Part H of the building regulations: drainage and waste disposal. Behind most London terraces runs a shared drain, so an extension often sits on top of one, and that brings in Part H, the water company and sometimes a build over agreement.

What Part H covers

Part H has six requirements: foul water drainage (H1), wastewater treatment systems and cesspools (H2), rainwater drainage (H3), building over or close to public sewers (H4), separate systems of drainage (H5) and solid waste storage (H6). The current document is the 2015 edition.

Building over or near a public sewer

Many drains behind London terraces became public sewers in 2011, when private shared drains and sewers connecting to the public network were transferred to the water companies. Building over one, or within 3 metres of it, needs the water company’s agreement; in most of London that is Thames Water, which offers build over agreements and guidance for small extensions over smaller pipes. The drain may need a new manhole moved outside the extension, a lintel or bridge where a wall crosses the pipe, or a CCTV survey before and after the work. Check the sewer maps early: it can decide the depth and position of the foundations.

New drains, inspection chambers and rodding eyes

New drains need access for clearing blockages: inspection chambers, manholes or rodding eyes at changes of direction and at set distances. Pipes are laid to a fall, bedded and protected where they pass under or through walls. A new soil and vent pipe (SVP) for a loft ensuite or a new bathroom must connect to the drain with the right fittings and an air admittance valve or vent where the approved document allows. Building control usually tests new drains before they are covered.

Closer rear view of the dormer, KRAMAN Ltd, LondonTimber rafters forming the hipped roof of the Highgate extension during construction, KRAMAN Ltd, LondonChimney stack on a tiled roof in Stratford during repair, under scaffolding, KRAMAN Ltd, LondonTimber joists and insulation during roof work on the Walthamstow house, KRAMAN Ltd, London

Rainwater and soakaways

Rainwater from a new roof goes to a drain, a water butt or a soakaway. A soakaway should be at least 5 metres from a building, and it only works where the ground drains: on London clay it often does not, so rainwater goes to the surface water sewer with the water company’s consent. Paving a front garden brings in planning rules on permeable surfaces as well.

Bin stores and septic tanks

H6 asks new homes, including flats formed in a conversion, to have adequate space for storing waste and recycling, with access for collection; councils add their own rules. Septic tanks and treatment plants are rare in London, where almost every house connects to the public sewer; where one is used, the Environment Agency’s general binding rules apply as well.

Questions people ask

Can I build an extension over a drain?

Often yes, but building over or within 3 metres of a public sewer needs the water company’s agreement, in most of London Thames Water, and building control checks the drain protection.

How far must a soakaway be from a house?

At least 5 metres from a building, and only where the ground lets water soak away, which London clay often does not.

Do new drains need building regulations approval?

Yes. New drains are building work under Part H; building control normally inspects and tests them before they are covered.

What is a rodding eye?

A sealed access point on a drain or soil pipe that lets a blockage be cleared with drain rods, used where a full inspection chamber is not needed.