Illustration of a technical section through a house extension and loft, with foundations, insulation, a staircase and a smoke alarm

Building regulations questions answered: the Building Regulations 2010 for house work

The Building Regulations 2010 set the standards for building work in England, and building control checks that the work meets them. This post answers the questions homeowners ask most, from what needs approval to what happens when an old extension or loft has no certificate.

What the Building Regulations 2010 are

The Building Regulations 2010 are the regulations made under the Building Act 1984 that apply to building work in England; they have been amended many times since. There are no single British building regulations: England, Wales, Scotland and Northern Ireland each have their own, and this post covers England. Building regulation consent, as some people call approval, comes from building control. Their technical requirements are grouped into parts, and the government publishes an approved document for each part with ways to meet it. Our approved documents guide lists every part, from Part A for structure to Part S for electric vehicle charging, and which ones come up in house work.

What needs approval

Extensions, loft conversions, structural alterations such as removing a load-bearing wall or a chimney breast, new drains, cavity wall insulation, replacement windows and doors, new heating systems and most electrical work need approval or a certificate from a registered installer. Repairs and like-for-like replacements often do not. A ground-floor porch or conservatory under 30 square metres can be exempt when it meets the conditions in the guide.

Closer rear view of the dormer, KRAMAN Ltd, LondonThe rear extension and roof addition viewed from the garden, KRAMAN Ltd, LondonTimber framing and exposed internal structure during the building work, KRAMAN Ltd, LondonInternal construction stage with exposed brickwork and timber joists overhead, KRAMAN Ltd, London

Certificates and lost paperwork

At the end, the council gives a completion certificate, or a private registered building control approver gives a final certificate to the council. Registered installers give their own certificates, such as a FENSA certificate for windows or an electrical installation certificate. If the paperwork is lost, the council building control department can usually confirm what it holds. Solicitors ask for these documents when a house is sold.

Work done without approval

Retrospective approval, called regularisation, is available from the council for work carried out without approval after 11 November 1985. The council may ask for parts of the work to be opened up so it can see the structure, insulation or drains, and may require changes before it issues a certificate. Some owners use an indemnity policy when they sell instead, but that does not make the work comply.

Windows, walls, roofs and stairs

Replacement windows need to meet the energy and safety rules, including safety glazing in low areas and window restrictors or guarding where a window sill is low on an upper floor. Wall, floor and roof insulation follow Part L, and a warm flat roof or a pitched roof is built to the details the designer chooses. Stairs follow Part K: a rise of no more than 220 mm, a going of at least 220 mm, a pitch of no more than 42 degrees and 2 metres of headroom, with 1.9 metres at the centre accepted in a loft conversion.

Questions people ask

Do I need building regulations approval for an extension?

Most extensions need approval; a small ground-floor porch or conservatory can be exempt when it meets the conditions on size, separation, glazing and heating.

What is a building regulations completion certificate?

The council certificate that the finished work met the building regulations as far as it could check; where a private approver supervised the work, its final certificate plays that role.

Can I get building regulations approval after the work is done?

Yes, through regularisation with the council for work done after 11 November 1985; parts of the work may need opening up, and changes may be required.

Who checks building regulations, the council or a private inspector?

Either: the council building control department, or a private registered building control approver, which was called an approved inspector until 2024.

Do replacement windows need building regulations approval?

Yes, unless a registered installer such as a FENSA member fits them and certifies the work; the certificate is what you keep.

Read next