Building guides

Choosing a building contractor in London

Compare relevant projects, written estimates, references and communication before you appoint a builder for your London home.

What work should a builder have done before?

Work like yours. Ask for two or three recent examples of similar work and speak to those clients, as Citizens Advice recommends. A kitchen refit, a whole-house refurbishment and a basement conversion involve different work, so read the scope as well as the photographs: replacing a roof over an extension is different from building the extension itself.

How do I check where an example project took place?

Ask the contractor where it took place, which work they carried out and whether the gallery covers one property or several. A contractor can serve an area without a published project on every street. Our portfolio distinguishes individual projects from bathroom and joinery collections.

How do I compare quotes from builders?

Get written quotes from at least three builders against the same drawings, room list and finish requirements. Ask each one to identify preparation, building work, fixtures, finishes, exclusions, undecided items and whether VAT is included. A total alone does not tell you whether two quotes cover the same work.

Which checks and documents should I ask a builder for?

Check that the company exists on Companies House and that it is a member of any trade association or approved trader scheme it names, such as TrustMark or the Federation of Master Builders, on that scheme's own website. Ask for current public liability insurance, and employers' liability insurance if the builder has employees, and check that the policies run until the work ends. Gas work must be done by a Gas Safe registered engineer. For electrical work use a qualified electrician: one registered with a competent person scheme can self-certify notifiable work under the building regulations, and without that registration that notifiable work goes through building control. A logo alone does not replace checking the documents.

What should be in the contract?

Agree a written contract before the work starts, covering the scope, timings, materials, tidying up and payments. Ask who will be your day-to-day contact and how access, deliveries and storage will work. If you will remain in the property, record which rooms must stay usable and how the working areas will be separated.

How should I pay a builder?

In stages tied to completed work, so that problems can be put right before the final payment. Citizens Advice advises against paying everything upfront: keep any deposit low, pay by card where you can and keep receipts for deposits and materials.

How should changes during the work be handled?

They should be described and priced in writing before the extra work starts. Ask how unexpected findings or requested changes will be recorded and how their effect on the programme will be communicated, and keep the agreed scope and later decisions together.

Examples to explore

Rear dormer above the kitchen extension at KRAMAN's Leytonstone project
Leytonstone project: rear dormer loft conversion, kitchen extension and house renovation.

Choosing a contractor · Preparing your brief · Discuss your project with Alex

Call us