Kitchen strip-out and refit

Complete kitchen refurbishment in Leyton E10, East London. See the photo gallery of this residential renovation project by KRAMAN Ltd, London builders.

About this project

A complete kitchen refit in Leyton E10. The old kitchen, with its dated units and tiled walls, was stripped out, the ceiling was opened back to the joists and re-boarded on a metal frame, and the new units went in on a freshly tiled floor.

The finished kitchen has white gloss units, a dark worktop with an inset sink and a high-arc tap, a built-in double oven with an extractor hood above the hob, and a recessed alcove with glass shelves for books and kitchenware. A glazed door leads out to the garden.

Scope of work

  • Strip-out of the old kitchen
  • New plasterboard ceiling on a metal frame
  • Floor tiling
  • Fitted kitchen with built-in appliances
  • Recessed alcove with glass shelving

Rules for this kind of work, checked 14 November 2026: GOV.UK: Approved Document P, electrical safety.

Planning similar work?

The sequence shows the old kitchen, the ceiling and floor preparation, and the fitted units. It helps separate the preparation work from the visible kitchen finishes when planning a refit.

Explore the relevant services:

Building and refurbishment in Leyton

For an initial discussion, send your postcode, the rooms or spaces involved and any existing drawings. Use our project brief checklist or discuss your project with Alex.

Have a similar project in mind?

The first site visit is free, and a written rough-order-of-magnitude budget follows within three working days.

07717 778 612 Or send a brief →

Published by , a London building company registered with Companies House in 2006 (no. 05781393). Federation of Master Builders member since 2009, NICEIC approved contractor and Gas Safe registered. Director: Alex Anokhin.

Disclaimer: planning, party wall and building regulations notes on this site are for informational purposes only and are not legal advice: the council, surveyor or solicitor on your project has the final word.

Updated

Call us