# Dormer loft conversion in London: rear, L shaped and bungalow dormers

Source: https://kraman.co.uk/services/dormer-loft-conversion-london/
Updated: 25 November 2026

A dormer conversion adds a box-shaped extension to the slope of the roof, turning a low loft into rooms with full headroom. It is the most common loft conversion in London: usually permitted development, and the quickest to build. We build rear dormers, L shaped dormers and bungalow dormers across East and North London from our base in Leytonstone.

Call 07717 778 612
[Send a brief](https://kraman.co.uk/contact/)

## Rear dormer loft conversion

A rear dormer runs across the back slope of the roof, with a flat roof and a near-vertical rear wall, and gives a bedroom and often an ensuite on a terraced or semi-detached house. A full dormer takes most of the width of the roof; a small dormer covers only part of it and suits a single room or a stair. On our [Leytonstone project](https://kraman.co.uk/project/leytonstone-5/) the rear dormer is clad in dark vertical cladding above a new kitchen extension.

## L shaped dormer

On a Victorian terrace with a rear addition, an L shaped dormer joins a dormer on the main roof to a second one over the back addition, creating two rooms or a bedroom with a bathroom. It needs more structure where the two roofs meet, and more care with the party walls on each side.

## Bungalow dormer conversion

Converting a bungalow loft with a dormer turns the roof into a first floor: this is how a dormer bungalow is made. Bungalow roofs often have a shallow pitch and a hipped roof, so the dormer usually runs across the rear, sometimes with a hip to gable change or a raised roof. The new stair comes up through the existing ground floor, which is often the main design question.

## Planning a dormer loft

A rear dormer within 40 cubic metres of extra roof volume on a terraced house, or 50 on a semi or detached house, set back from the eaves and in matching materials, is usually permitted development. Front dormers, balconies and dormers in a conservation area need planning permission. Our [loft conversion planning guide](https://kraman.co.uk/guides/loft-conversion-planning-permission/) sets out the limits, and building regulations cover the structure, fire safety, stairs and insulation.

## What a KRAMAN dormer conversion includes

Architectural drawings, structural calculations, party wall notices and agreements, the building control application and inspections, steelwork, new floor joists, the dormer structure and roof, insulation to current Part L standards, electrics, plumbing for an ensuite, plastering, joinery, the staircase, decoration and flooring. Dormer cheeks are finished in matching tile or zinc, and rooflights go on the front slope where planning allows. At handover you receive the building control completion certificate and the window and electrical certificates.

## How long a dormer conversion takes

A standard rear dormer runs 8 to 11 weeks on site, after the drawings, any planning or Lawful Development Certificate, party wall notices and building control approval. Most families stay in the house during the work, because the build is concentrated above the top floor until the new stair is opened up.

## Questions people ask

### What makes the best dormer loft conversion for a terrace?

Full headroom where you stand and over the stair, a dormer set back from the eaves in materials that suit the house, and a layout that fits the bed and the bathroom; a dormer attic conversion is the same thing.

### What is involved in converting a bungalow loft?

A new stair from the ground floor, a dormer or a hip to gable change for headroom, new floor joists, insulation and fire safety, with building regulations approval.

### What is a dormer loft conversion?

A loft conversion that adds a box-shaped extension to the roof slope, with a flat roof and a near-vertical wall, to give full headroom over most of the new floor.

### Do I need planning permission for a dormer loft conversion?

A rear dormer within the permitted development limits usually does not; front dormers, balconies and dormers in conservation areas do.

### How long does a dormer loft conversion take?

A standard rear dormer takes 8 to 11 weeks on site, after drawings and approvals.

### What is an L shaped dormer?

Two joined dormers, one on the main roof and one over the rear addition of a Victorian terrace, forming an L and giving two rooms or a bedroom and bathroom.

### How much does a dormer loft conversion cost?

It depends on the roof, the size of the dormer, the stair and the fit-out; we price each loft after a free site visit. Our loft conversion cost post explains what sets the price.

## Related pages

### [Hip to gable loft conversion in London](https://kraman.co.uk/services/hip-to-gable-loft-conversion-london/)

### [Mansard loft conversion in London](https://kraman.co.uk/services/mansard-loft-conversion-london/)

### [Loft conversion in London](https://kraman.co.uk/services/loft-conversion-london/)

### [Loft conversion planning permission](https://kraman.co.uk/guides/loft-conversion-planning-permission/)

### [Approved Document B: fire safety in a loft conversion](https://kraman.co.uk/guides/approved-document-b/)

### [Approved Document K: stairs and guarding](https://kraman.co.uk/guides/approved-document-k/)

## Discuss your dormer loft conversion

Free initial site visit. Every estimate is individual, and scope, specification and price are agreed with you before work starts.

07717 778 612
[Or send a brief](https://kraman.co.uk/contact/)
