Approved Document G is the guidance on Part G of the building regulations: sanitation, hot water safety and water efficiency. It is behind the unvented cylinder in your airing cupboard, the temperature limit on a new bath and the water use figure every new London home must meet.

By [KRAMAN Ltd](https://kraman.co.uk/about/), builders in London since 2006.

## What Part G covers

Part G sets requirements for a wholesome cold water supply (G1), water efficiency in new homes (G2), hot water supply and safety (G3), sanitary conveniences and washing facilities (G4), bathrooms (G5) and food preparation areas (G6). The current document is the 2015 edition incorporating 2016 and 2024 amendments.

## Hot water safety and unvented cylinders

An unvented hot water cylinder stores water at mains pressure, so it has safety devices: a temperature and pressure relief valve, an expansion vessel and a discharge pipe that runs to a safe, visible place. It must be installed by a competent person and notified, and serviced as the maker says. In a new home, and in a bath newly provided by a material change of use, the hot water to the bath is limited to 48°C at the outlet, usually by a thermostatic mixing valve.

## WCs, basins, bathrooms and kitchens

Every home needs at least one WC with a washbasin in or next to the room, a bathroom with a bath or shower, and a kitchen sink. A WC must be separated from a kitchen by a door, and the washbasin must have hot and cold water. When a WC moves or an ensuite is added in a [loft conversion](https://kraman.co.uk/services/loft-conversion-london/), Part G sits with Part H for the soil pipe and Part F for the extract fan.

## Water efficiency in new homes

A new home must be designed for a water use of no more than 125 litres per person per day, or 110 where a planning condition sets the optional standard. In London, Policy SI 5 of the London Plan asks for 105 litres per person per day or less, plus up to 5 litres for outdoor use, which is why new London homes come with low-flow taps, smaller baths and dual-flush WCs.

## Questions people ask

### What is Approved Document G?

The government guidance on Part G of the Building Regulations 2010: sanitation, hot water safety and water efficiency.

### Does an unvented cylinder need building regulations approval?

Yes. It must be installed by a competent person and notified, with its safety valves and discharge pipe installed as the approved document sets out.

### What is the maximum bath water temperature in a new home?

48°C at the bath outlet, for a bath in a new home or one provided through a material change of use.

### What is the water efficiency standard for new homes in London?

The London Plan asks for 105 litres per person per day or less plus up to 5 litres for outdoor use, below the 125 litre national standard.

## Read next

### [Building regulations approved documents A to T: what each part covers](https://kraman.co.uk/guides/approved-documents/)

### [Cost of a new bathroom in London: what a bathroom renovation costs and why](https://kraman.co.uk/blog/bathroom-renovation-cost-london/)

### [Approved Document H: Part H drainage, sewers and soakaways for extensions](https://kraman.co.uk/guides/approved-document-h/)

Sources: [GOV.UK: sanitation, hot water safety and water efficiency, Approved Document G](https://www.gov.uk/government/publications/sanitation-hot-water-safety-and-water-efficiency-approved-document-g) · [London Plan 2021](https://www.london.gov.uk/programmes-strategies/planning/london-plan/london-plan-2021).