# Approved Document A: Part A structure rules for beams, lofts and extensions

Source: https://kraman.co.uk/guides/approved-document-a/
Updated: 25 November 2026

Approved Document A is the guidance on Part A of the building regulations: structure. Every loft conversion, extension and knock-through in a London house touches it, because each one changes how the weight of the house reaches the ground. Here is what Part A asks for and how it is shown to building control.

By [KRAMAN Ltd](https://kraman.co.uk/about/), builders in London since 2006.

## What building regs Part A covers

Part A has three requirements: A1 loading, so the building carries its weight, the people and furniture in it, snow and wind safely to the ground; A2 ground movement, so foundations allow for shrinking clay, landslip and subsidence; and A3 disproportionate collapse, which applies mostly to larger buildings. The approved document gives simple rules for ordinary houses, such as wall thicknesses and the size of timber floor joists, and points to the British Standards and Eurocodes engineers use for everything else.

## Knocking through and removing walls

Taking out a load-bearing wall, or a chimney breast, removes support from the floors, walls and roof above. Part A requires a replacement: usually a steel beam sitting on padstones, sometimes with new posts down to new foundations. A structural engineer calculates the beam size and the bearings, building control approves the calculations before work and inspects the steel before it is covered, and the steel is protected against fire. A non load-bearing partition can usually come out without these steps; the engineer or building control confirms which wall is which. Our [chimney breast removal post](https://kraman.co.uk/blog/chimney-breast-removal/) covers chimney breasts in more detail.

## Loft floors and roofs

The ceiling joists of a loft were sized to carry a ceiling, not a bedroom. A loft conversion adds new floor joists, often spanning between steel beams, and the engineer checks the roof once purlins, struts or trusses are cut for a dormer. Lateral restraint straps tie the new floor to the walls, and the wall plate is strapped down to hold the roof against wind.

## Extension foundations, lintels and walls

An extension needs foundations designed for the ground: London clay shrinks and swells, so foundations near trees go deeper. New openings need lintels sized for the load above. A single skin brick wall is fine for a small garden wall or a porch, but a habitable extension needs walls built to the thickness and the restraint the approved document or the engineer sets. Underpinning an existing wall, or building near a neighbour, can also need notice under the Party Wall etc. Act 1996.

## How it is shown to building control

For anything beyond the simple rules, building control asks for structural calculations and drawings from an engineer. On a full plans application they are checked before work starts; on a building notice they are sent before that part of the work. On our projects we arrange the engineer and the calculations as part of the job.

## Questions people ask

### What is Approved Document A?

The government guidance on Part A of the Building Regulations 2010, structure: loading, ground movement, disproportionate collapse and the simple rules for ordinary houses.

### Do I need building regulations approval to remove a load-bearing wall?

Yes. It is structural work: an engineer sizes the beam, building control approves the calculations and inspects the steel before it is covered.

### Can I remove a non load-bearing wall without building regulations?

Usually yes, if it carries nothing and its removal does not affect fire escape routes; check first that it really is non load-bearing.

### Do I need structural calculations for a loft conversion?

Almost always: the new floor, any steel beams and any change to the roof structure are designed by an engineer and checked by building control.

## Read next

### [Building regulations approved documents A to T: what each part covers](https://kraman.co.uk/guides/approved-documents/)

### [Chimney breast removal: cost, regulations and support for the chimney above](https://kraman.co.uk/blog/chimney-breast-removal/)

### [Approved Document C: Part C damp proofing, radon and ground floors](https://kraman.co.uk/guides/approved-document-c/)

Sources: [GOV.UK: structure, Approved Document A](https://www.gov.uk/government/publications/structure-approved-document-a) · [GOV.UK: Approved Documents](https://www.gov.uk/government/collections/approved-documents) · [GOV.UK: party walls and building work](https://www.gov.uk/party-walls-building-works).