# House extension costs in London: answers to common questions

Source: https://kraman.co.uk/blog/house-extension-cost-questions/
Updated: 25 November 2026

The cost of a house extension in London is set by what you build, where it meets the house and how it is finished, not by its floor area alone. These are the questions we hear most about extensions, from garages and porches to a second storey, with straight answers.

[Alex Anokhin, KRAMAN Ltd](https://kraman.co.uk/about/). Published 25 November 2026.

## Single storey, two storey and side return extensions

A single storey rear extension is the most common London extension; a side return fills the alley beside a Victorian rear addition; a wrap-around does both. A two storey extension adds a bedroom as well as ground-floor space, with one set of foundations and one roof serving both floors; our [two storey extension post](https://kraman.co.uk/blog/two-storey-extension-cost/) covers it. Our [house extension page](https://kraman.co.uk/services/house-extension-london/#house-extension-cost) lists what changes the price.

## Garages, porches, conservatories and garden rooms

A garage extension, an extension built over an existing garage or a garage converted into a room each needs building regulations approval; building over a garage also needs the walls and foundations below checked. A small front porch and a ground-floor conservatory can be exempt from building regulations when they meet the conditions in our [building regulations guide](https://kraman.co.uk/guides/building-regulations-completion-certificate/). A garden room or summer room attached to the house is an extension; a separate outbuilding follows different planning rules. A timber frame or wooden extension, a glazed sunroom or an orangery all go through the same planning and building control steps as brick.

## Planning permission for an extension

Many single storey rear extensions are permitted development within the limits on depth and height; larger ones use prior approval, and side extensions in a conservation area need planning permission. The rules, the maximum depths and the guidelines councils use are in our [permitted development guide](https://kraman.co.uk/guides/permitted-development-rights/). A residential extension on a flat always needs planning permission.

## Who builds it: extension builders, architects and contractors

Some extension builders and contractors build only to the drawings you bring; others, like us, arrange the architect or designer, the structural engineer, building control and party wall notices, then build. Whoever you choose, compare itemised quotes against the same drawings. Flat roof work on an existing extension, such as re-covering an old felt roof with a modern membrane, is priced as its own job.

## Questions people ask

### What is the average extension cost in London?

We do not publish an average extension cost: glazing, structure, the opening into the house and the finish move the price more than the floor area, so every extension is priced from its drawings.

### What sets a kitchen extension cost?

The structure and steel where it opens into the house, the glazing and roof lights, and the kitchen itself; kitchen extension prices vary more with those choices than with the size.

### What does a side return extension cost?

A side return extension cost depends on the steel needed to open up the side wall, the roof glazing, drainage under the alley and party wall work; it is priced from a site visit.

### How much does a house extension cost per square metre?

There is no fair rate per square metre or per square foot, because glazing, the opening into the house and the finish change the price more than the floor area. The quote after a site visit is built line by line.

### Can I build an extension over my garage?

Often. A structural engineer checks that the garage walls and foundations can carry the new floor, and the work needs building regulations approval and usually planning permission.

### Do I need planning permission for a porch or conservatory?

A small porch can be permitted development within the Class D limits, and a single storey conservatory at the back follows the rear extension limits, unless the house has lost its permitted development rights.

### Do I need an architect for an extension?

You need drawings for building control and, where it applies, planning; an architect or a designer prepares them, and we arrange both the drawings and the structural calculations.

### How long does a house extension take?

A single-storey rear extension runs 10 to 14 weeks on site and a double-storey extension 16 to 22 weeks, after the drawings, party wall notices and approvals.

## Read next

### [The GPDO explained: the General Permitted Development Order 2015, outbuildings and sheds](https://kraman.co.uk/blog/gpdo-permitted-development-order/)

The General Permitted Development Order 2015 for London homeowners: the householder classes, outbuildings, sheds and garden rooms.

### [Building regulations questions answered: the Building Regulations 2010 for house work](https://kraman.co.uk/blog/building-regulations-questions/)

The Building Regulations 2010 for house work in England: what needs approval, certificates, retrospective approval, windows, stairs and fire.

### [Loft conversion cost in London: answers to the questions people ask](https://kraman.co.uk/blog/loft-conversion-cost-questions/)

What sets the cost of a loft conversion in London: dormer, mansard, hip to gable, Velux, ensuite, stairs and steel, with answers to the questions people ask.

Sources: [GOV.UK: permitted development rights for householders, technical guidance](https://www.gov.uk/government/publications/permitted-development-rights-for-householders-technical-guidance) · [Planning Portal: is building regulations approval needed for an extension?](https://www.planningportal.co.uk/permission/common-projects/extensions/is-building-regulations-approval-needed-for-an-extension) · [GOV.UK: building regulations approval, when you do not need approval](https://www.gov.uk/building-regulations-approval/when-you-dont-need-approval).